Concrete Cost per m³ in Australia 2026: Real Delivered vs Installed Rates by MPa & Mix

Concrete cost per m³ in Australia sounds simple, but “per cubic metre” only makes sense once you know what’s included. Some prices are supply-only, some are delivered, and some are installed with labour, reinforcement, and pumping. This guide breaks the estimator pricing components down in plain terms, so you can compare quotes properly and budget with confidence.

If you’re planning a slab, footing, driveway, or small commercial pour, this concrete cost guide 2025–26 Australia is built for you. Prices vary because project scope changes—strength grade, mix type, delivery distance, short-load rules, and time on site all move the final rate. Use the sections below to pick the right MPa, understand mix adders, and estimate your total cost without surprises.

What “Concrete Price per m³” Includes (Supply vs Delivered vs Installed)

When people compare concrete cost per m³, they often compare different things without realising it. A supply-only rate is very different from a delivered or fully installed rate. This is why ready-mix concrete pricing in Australia can look inconsistent online.

Understanding what’s included helps you compare quotes properly and avoid budget surprises.

  • Supply-only price – The plant price for concrete only, excluding delivery and labour.
  • Delivery cost – Transport charges added to the delivered concrete price per m³.
  • Installed concrete – Includes supply, delivery, and labour cost for placing.
  • Labour for placing – Often excluded from the basic supply and delivery concrete cost.
  • Reinforcement cost – Steel mesh or bars are usually priced separately.
  • Online averages – Often mix different scopes, so the concrete rate per m³ rarely matches real quotes.

Concrete Price per m³ by Strength (MPa) — Australia’s Most Common Grades

Concrete cost per m³ in Australia varies by strength grade (MPa) because stronger mixes need more cement and stricter quality controls. Using strength-based pricing helps you compare concrete costs by MPa fairly — for example, C20 ≈ 20MPa is a common naming style used in supplier quotes and industry discussions. Strength is the core price anchor in ready-mix concrete pricing in Australia because higher grades generally cost more per m³ due to mix design, durability, and specification requirements.

Below is a clean table you can use in your article showing typical ranges and common uses (prices are indicative and vary by location, supplier, delivery distance, and order size):

Strength GradeTypical UseIndicative Concrete Cost per m³ (AUD)
20MPa (C20)Footpaths, garden edges, and non-structural slabs~$300–$400
25MPa (C25)House slabs, slab concrete, footing concrete~$400–$450
30MPa (C30)Higher performance structural mix, driveways, walls~$430–$500

20MPa (C20) — Light Duty / Non-Structural Typical Uses

20MPa (often written as C20) is one of the most affordable strength grades you’ll see in ready-mix concrete pricing in Australia. It’s usually used for light-duty work like garden edges, footpaths, small patios, or non-structural slab concrete. Because the strength grade here is lower, the mix contains less cement and simpler specifications, which keeps the concrete strength price on the lower side compared with structural mixes. This makes 20MPa concrete cost per m³ a good benchmark for basic, low-stress applications.

25MPa (C25) — Common Residential Structural Mix

25MPa (or C25) is the standard structural grade in most Australian residential projects. It’s commonly used for slab concrete, footing concrete, residential driveways, and general structural work around the home. The cost of C25 concrete in Australia typically sits in the mid-range because it balances strength and cost. Builders and suppliers often use 25MPa as the default grade for house slabs, so understanding this concrete strength price helps you set more accurate budgets and compare quotes easily.

30MPa (C30) — Higher Performance Structural Mix

30MPa (written as C30) is a higher-performance concrete strength grade used where extra durability and higher specification are needed. This includes heavier driveways, structural walls, exposed slabs, and areas where service loads or environmental conditions demand more resilience. The 30MPa concrete cost per m³ is usually higher because the mix requires more cement and tighter quality standards. Using C30 can improve long-term performance, but you should expect the price to reflect these durability and specification enhancements. 

Mix Type Differences (Same MPa, Different Price)

In Australia, two loads can be the same strength grade (MPa) and still have different pricing. That’s because concrete mix cost differences sit outside strength: slump/workability, aggregate size, placement method (chute vs pump), plus durability and specification adders like admixtures and fibres. These items are ordered separately and can change the “concrete mix pricing Australia” outcome.

You can see this in real supplier schedules. For example, one WA supplier lists separate adders like pump mix, slump increase per 10mm, and smaller aggregate—all of which can move the $/m³ even if MPa stays the same.

Pump Mix vs Standard Mix (When You Actually Need It)

Pump mix is about how the concrete needs to be placed, not just its MPa. If access is tight, the pour is raised, or the truck can’t get close, you may need pumping. Australian ordering guidance is clear: the supplier needs to know the method of placement (chute or pump) because it influences the concrete mix type and mix design. It also notes that current pumping and site practices often demand higher slumps, which can push costs up.

Cost-wise, you’re usually paying two things: the pump hire and any pumpable mix adders. Pump hire is commonly charged per hour or per m³ (examples in Australia include boom pumps around $200–$400/hr, and some line-pump rate sheets show ~$15/m³ and ~$200/hr depending on setup and travel). Separately, some suppliers also charge a pump-mix adder (one WA schedule lists “Pump Mix (20MPa mixes only)” at $4/m³), and even a slump increase adder (e.g., $3/m³ per 10mm).

Admixtures and Special Specs (Set Control, Workability, Fibres)

This is where the cost impact of admixtures shows up. Even at the same MPa, adders like set control (accelerators/retarders), higher workability, fibres, and durability requirements change the mix and the price. Australian ordering notes that once you start specifying extra parameters (like durability, exposure classification, or admixtures & additives), you’re moving into “special-class” territory, which can mean extra discussion, controls, and cost.

Real market schedules show how quickly these adders stack up. One WA supplier lists accelerator adders at $5 / $10 / $20 per m³ (depending on rate), waterproofing additives at $75–$120 per m³, and even charges like manual handling/washout for fibres/oxides ($50 per load). For fibre concrete cost in Australia, fibre is often dosed by kg per m³ (e.g., some macro synthetic fibre guidance shows ~3–6 kg/m³ for slab-on-grade type applications). If fibres are priced as a bagged product, the material alone can be “tens of dollars per m³” (for example, a retail listing shows $29.95 inc GST for 2.3kg, which roughly equates to about $39–$78 per m³ at 3–6 kg/m³ before any batching/handling fees). 

Delivered Cost per m³ (Supply + Delivery) — The Most Common “Real-World” Price

In Australia, the number most people get quoted is the delivered rate: the supply cost (batching plant price) plus the delivery cost to your site. Suppliers also apply extra fees for cartage distance, short loads, and waiting time, so “online averages” rarely match your invoice.

  • Distance to the plant (extra cartage) – Many schedules add $/km/m³ once you’re outside a set radius (e.g., >15–20 km at $3.00 per km per m³).
  • Minimum loads (short-load fees) – Small pours can cost more per m³ because you’re charged on the “unused” capacity (e.g., load <4m³ charged per undelivered m³).
  • Waiting time on site – Often the first 30 minutes is included, then a per‑minute fee applies (published examples range about $2.50–$3.50/min).
  • Booked time slots & after-hours – Late finishes, Saturdays, public holidays, or plant opening outside normal hours can attract surcharges (often per m³ or per load).
  • Regional price variation – “Concrete cost estimating by location Australia” is real: major suppliers publish different fee sheets by state/metro, and even transport charges can differ by region (e.g., SEQ vs national).
  • Seasonal demand pricing – Broader market pressure matters too. Industry pricing commentary notes that concrete costs can keep rising with energy costs and strong project demand, which can flow through to delivered quotes.

Installed Cost Adders (Placing Labour, Reinforcement, Pumping)

Delivered concrete is only the supply cost + delivery cost. Your total job cost changes when you add the work needed to place it, finish it, and meet the spec. In Australia, these “installed” adders often explain why two projects with the same MPa end up with very different totals.

A quick check keeps quotes comparable: Is placing/finishing included? Is reinforcement included? Is pumping included? (If any are “no”, you’re not looking at the installed price yet.)

Labour Cost for Placing and Finishing (Why Crew Time Matters)

The labour cost for placing concrete is mostly crew time. Concreters commonly charge an hourly contractor rate, and published Australian guides put typical rates around $70–$150 per hour, depending on experience and job complexity. Crew size, access, and the finish you want (basic float vs tighter finishes) all change how long the pour takes. More edging, steps, falls, or tight access usually means slower output, so the labour component per m³ rises even if the delivered concrete price stays the same.

Rule of thumb: small pours often cost more per m³ in labour because setup and finish time don’t shrink much when volume shrinks. Always ask what the rate assumes (crew size, hours on site, and what “finishing” includes).

Reinforced Concrete Pricing (Steel + Fixing Labour)

Reinforcement cost is usually not included in the concrete mix price. Reinforced concrete pricing adds (1) the steel itself and (2) the labour to place and tie it (plus chairs, laps, and cutting). As a simple market example, a common mesh size (6 m x 2.4 m) can be priced around $86 at one supplier and $125.38 at another for the same sheet size. That is before waste, overlaps, bar chairs, and delivery.

Fixing labour also matters. Wage data for steel fixers sits around the mid-$40s per hour on average, and contractor charge-out can be higher once supervision, insurance, and travel are included. This is why a reinforced slab cost in Australia can move quickly when the engineer increases bar size, spacing, or adds more detailing at edges and penetrations.

Pumping Cost per m³ (When Site Access Drives Equipment)

Pumping is a site-access decision. If the truck can’t chute close enough, you pay for the equipment and time. Australian pump rate sheets often show a per m³ pumped charge plus an hourly minimum—for example, one line pump schedule lists $7/m³ and $170/hr (min 4 hours), while another shows $15/m³ and $200/hr for a line pump (with other fees like washout and extra line length).

On small pours, the hourly minimum can dominate the cost per m³. On large pours, the per-m³ pumping rate becomes more noticeable. If access is simple, a chute pour can avoid the concrete pump hire cost per m3 altogether.

How to Estimate Concrete Costs (Quick, Accurate Method)

Here’s a quick way to estimate concrete costs that stays accurate in the Australian market. It keeps the estimator pricing components clear, so you don’t mix delivered rates with installed totals.

Start with volume, pick the right MPa and mix, price the delivered rate, then add the installed adders and a small buffer for waste.

  • Measure volume – Calculate m³ from length × width × thickness, matched to your project scope.
  • Choose MPa & mix – Strength and mix type drive the main concrete cost factors (strength, mix, delivery).
  • Get a delivered rate – Use supply + delivery as your baseline, not online averages.
  • Add installed adders – Include placing labour, reinforcement, and pumping if access is needed.
  • Allow for waste – Add a small percentage for over-order, spillage, and uneven subbase.
  • Add contingency – Include a buffer for small job extras like waiting time or short-load fees.

Quote Checklist (Stop Variations Before They Start)

Use this before you accept a concrete quote. It keeps the estimator pricing components clear, so you can compare like-for-like and avoid “we assumed…” surprises later. It also makes sure your supply and delivery concrete cost matches your real project scope.

Concrete specification (what you’re buying)

  • Strength grade (MPa) — Confirm the exact MPa and whether the supplier uses “C20 ≈ 20MPa” naming.
  • Mix type — Standard vs pump mix, plus any slump/workability request.
  • Durability/spec requirements — Exposure class, fibres, set control, waterproofing, or any special adders.

Delivery and site charges (what changes the delivered rate)

  • Delivery fees itemised — Base delivery, distance/cartage rules, and any time-slot or after-hours charges.
  • Short-load and minimums — Minimum m³ and how the short-load fee is calculated if you order under it.
  • Waiting time — Includes unload time and the standby rate after that (per minute or per block).

Installed adders (what turns delivered into total job cost)

  • Pumping terms (if needed) — Pump type, minimum hours, per m³ rates, washout/prime, and extra hose length.
  • Placing and finishing scope — What’s included (screed, float, edge, broom, cut joints) and what’s excluded.
  • Reinforcement cost — Steel supply (mesh/bars), chairs, laps, delivery, and fixing labour (reinforced slab cost in Australia varies a lot here).

Quote hygiene (to prevent disputes)

  • Validity and lead time — How long the price holds, and how soon they can pour.
  • What’s excluded — Get exclusions written clearly (concrete quote exclusions Australia), especially disposal, re-visits, and extra waiting time.

FAQs

Which MPa concrete should I use for a house slab in Australia?

For most homes, builders commonly use 25MPa (C25) as the standard strength grade for slabs, with higher grades used when the engineer specifies it. The right choice depends on your slab design, soil conditions, and durability requirements. This is why the concrete price per m³ by strength matters more than online averages.

Does pump mix cost more than standard concrete?

Yes, pump mix often costs more because it needs a mix design that flows through the pump line, and you usually add a pumping cost on top. Even if the MPa is the same, ready-mix concrete pricing in Australia changes when pumping is required due to site access.

What does “delivered cost per m³” usually include?

Delivered cost per m³ usually means supply cost + delivery cost from the batching plant to your site. It may still exclude items like short-load fees, extra cartage, waiting time, and any pumping cost if access requires equipment.

Why does the concrete price change by location in Australia?

Concrete cost per m³ changes by location because batching plants have different supply costs, and delivery distance affects cartage. Regional availability, travel time, and local demand also shift pricing, so the same strength grade can be priced differently across suburbs and towns.

Why do two quotes differ even for the same MPa?

Two quotes can differ because the concrete mix type and the additives can be different. Slump/workability, durability specs, admixtures, delivery rules, and waiting time charges can all change the final cost even when the strength grade is identical.

Is the pumping cost included in the concrete cost per m³?

Usually no. Pumping cost is commonly separated from the concrete cost per m³ because it depends on site access and equipment. If you need a pump, ask for the pump hire terms and whether they charge per m³, per hour, or both.

Conclusion

A concrete cost estimate per m³ in Australia is easiest to manage when you separate the price into clear parts. Start with the delivered rate, then check what’s driving it: strength grade, mix type, delivery rules, and time on site. When you compare quotes this way, you stop bad comparisons, and you get a number you can actually budget around.

Before you lock anything in, treat “installed” as a different cost layer. Placing and finishing labour, reinforcement, and pumping can move the total more than the concrete itself on smaller pours. If you confirm the scope and exclusions up front, you’ll avoid variations and make smarter decisions with your slab, footing, or driveway budget.